Join BookitisSave favorites, build lists, and follow creators.

Massachusetts. Department of Public Works

Author detail

MD
24 featured books

Bookitis has not yet captured a biography for this author, but the catalog links below show the books currently associated with this profile.

OL7221741A

Overview

Catalog identity and bibliographic footprint for this author.

24 representative editions

Author pages in Bookitis are intended to show only works actually attributed to the author and a representative edition for each of those works.

Catalog identity

How this author appears inside the active Bookitis catalog.

  • Display name

    Massachusetts. Department of Public Works

  • Source identifier

    OL7221741A

Featured books

Representative editions for works actually authored by this person.

Works in catalog

Quick navigation into the work-level grouping pages behind the featured books.

  • The Massachusetts amendments to the manual on uniform traffic control devices and the standard municipal traffic code

    Representative edition published 1987

    Open Work
  • U.S. Route 44 (from State Route 58 in Carver to State Route 3 in Plymouth) In Carver, Kingston, Plymouth and Plympton Plymouth County, Massachcusetts

    Representative edition published 1986

    Open Work
  • A guide to managing truck traffic on local streets

    Representative edition published 1985

    Open Work
  • Replacement of the New Bedford-Fairhaven Bridge

    Representative edition published 1985

    Open Work
  • Final environmental impact report for the Snow & Ice Control Program of the Massachusetts Dept. of Public Works, Metropolitan District Commission, Massachusetts Bay Transit Authority, Massachusetts Turnpike Authority

    Representative edition published 1978

    Open Work
  • Semiannual report to Governor Francis W. Sargent on the highway program

    Representative edition published 1970

    Open Work
  • Audit services procurement by the Massachusetts Department of Public Works

    Representative edition published 1991

    Open Work
  • Central Artery (I-93)/Third Harbor Tunnel (I-90) project Boston, Massachusetts final supplemental environmental impact statement, report EOEA #4325

    Representative edition published 1990

    Open Work
  • Phase I, step 2 intensive archaeological survey of the Wisdom Way and River, Mill, and Meade Streets relocation and reconstruction project, Greenfield, Massachusetts

    Representative edition published 1983

    Open Work
  • Supplement to the draft environmental impact statement/report, Third Harbor Tunnel, Interstate 90/Central Artery, Interstate 93, Boston, Massachusetts

    Representative edition published 1983

    Open Work
  • Phase I additional intensive archaeological survey of the route 25 modified upland alignment, Bourne, Massachusetts

    Representative edition published 1983

    Open Work
  • Draft environmental impact statement/report

    Representative edition published 1982

    Open Work
  • Phase I, step 1 archaeological reconnaissance of the Wisdom Way and River, Mill, and Meade Streets relocation and reconstruction project, Greenfield, Massachusetts

    Representative edition published 1982

    Open Work
  • Phase I, step 2 (intensive) cultural resources survey of the proposed temporary bridge over the Merrimack River at Lowell, Massachusetts

    Representative edition published 1982

    Open Work
  • Phase I, step 2 archaeological field survey of the proposed Henderson Road realignment, Williamstown, Massachusetts

    Representative edition published 1981

    Open Work
  • Phase I, step 1 archaeological survey of the Flynt Street reconstruction project, Palmer, Massachusetts (contract #20233)

    Representative edition published 1980

    Open Work
  • Phase I, step 1 archaeological survey of the proposed Henderson Road realignment, Williamstown, Massachusetts (contract #20233)

    Representative edition published 1980

    Open Work
  • Boston-Cape Cod bikeway

    Representative edition published 1979

    Open Work
  • Phase I, step 2 archaeological survey for the Methuen Rte. 213-113 connector project, Methuen, Massachusetts (contract #20233)

    Representative edition published 1979

    Open Work
  • Phase I, step 1 archaeological survey of the Montgomery Street reconstruction project, Chicopee, Massachusetts

    Representative edition published 1979

    Open Work
  • Phase I, step 1 archaeological survey of the route 181 realignment, Belchertown, Massachusetts (contract #20233)

    Representative edition published 1979

    Open Work
  • Phase II management summary report for Locality 4, ICA 76, Route 31, Ashby, Massachusetts

    Representative edition published 1978

    Open Work
  • Phase II archaeological survey of the Marlborough route 85 connector, Marlborough, Massachusetts

    Representative edition published 1978

    Open Work
  • Southwest corridor environmental impact analysis for the proposed Orange Line relocation and arterial street

    Representative edition published 1976

    Open Work