United States. Bureau of Entomology
Author detail
Bookitis has not yet captured a biography for this author, but the catalog links below show the books currently associated with this profile.
Overview
Catalog identity and bibliographic footprint for this author.
Catalog identity
How this author appears inside the active Bookitis catalog.
Display name
Source identifier
Featured books
Representative editions for works actually authored by this person.
- Image source: Open LibraryB
Bulletin
cover - Image source: Open LibraryBI
Bulletin, Issues 66-71
cover - Image source: Open LibraryIL
Insect Life, Volume 7
cover - Image source: Open LibraryBV
Bulletin, Volumes 1-10
cover - Image source: Open LibraryCI
Circular, Issues 1-100
cover - Image source: Open LibraryBV
Bulletin, Volumes 94-99
cover - Image source: Open LibraryBI
Bulletin, Issues 96-100
cover - Image source: Open LibraryBI
Bulletin, Issues 31-40
cover - Image source: Open LibraryIL
Insect Life, Volume 3
cover - Image source: Open LibraryBI
Bulletin, Issues 109-113
cover - Image source: Open LibraryBV
Bulletin Volume no. 96-97 1911-12
cover - Image source: Open LibraryBI
Bulletin, Issues 49-57
cover - Image source: Open LibraryBI
Bulletin, Issues 25-33
cover - Image source: Open LibraryBI
Bulletin, Issues 11-20
cover - Image source: Open LibraryMS
Mosquito survey and control, Government Camp, Oregon. Mt. Hood National Forest
cover - Image source: Open LibraryPR
Progress report of experiments on the control of cabbage worms
cover - Image source: Open LibraryEC
European corn borer
cover - Image source: Open LibraryCR
Complete research program, European corn borer, 1932
cover - Image source: Open LibraryRO
Relation of temperature and moisture to brood development of the western pine beetle
cover - Image source: Open LibraryTU
The use of the ethylene oxide-carbon dioxide mixture for treating stored grain
cover - Image source: Open LibraryMO
Memorandum on the Mediterranean fruit fly prepared for the use of the Subcommittee of the House Committee on Appropriations
cover - Image source: Open LibraryTB
The biological basis of sterilization on account of the Mediterranean fruit fly
cover - Image source: Open LibrarySF
Suggestions for the prevention of infestations of cultivated mushrooms by insects and other pests
cover - Image source: Open LibraryTS
The seed-corn maggot, Hylemyia cilicrura Rond., as a pest of newly planted seed potatoes in the coastal area of the Carolinas; summary of control studies, 1925-1930
cover
Works in catalog
Quick navigation into the work-level grouping pages behind the featured books.
- Open Work
Bulletin
- Open Work
Bulletin, Issues 66-71
- Open Work
Insect Life, Volume 7
- Open Work
Bulletin, Volumes 1-10
- Open Work
Circular, Issues 1-100
- Open Work
Bulletin, Volumes 94-99
- Open Work
Bulletin, Issues 96-100
- Open Work
Bulletin, Issues 31-40
- Open Work
Insect Life, Volume 3
- Open Work
Bulletin, Issues 109-113
- Open Work
Bulletin Volume no. 96-97 1911-12
- Open Work
Bulletin, Issues 49-57
- Open Work
Bulletin, Issues 25-33
- Open Work
Bulletin, Issues 11-20
- Open Work
Mosquito survey and control, Government Camp, Oregon. Mt. Hood National Forest
- Open Work
Progress report of experiments on the control of cabbage worms
- Open Work
European corn borer
- Open Work
Complete research program, European corn borer, 1932
- Open Work
Relation of temperature and moisture to brood development of the western pine beetle
- Open Work
The use of the ethylene oxide-carbon dioxide mixture for treating stored grain
- Open Work
Memorandum on the Mediterranean fruit fly prepared for the use of the Subcommittee of the House Committee on Appropriations
- Open Work
The biological basis of sterilization on account of the Mediterranean fruit fly
- Open Work
Suggestions for the prevention of infestations of cultivated mushrooms by insects and other pests
- Open Work
The seed-corn maggot, Hylemyia cilicrura Rond., as a pest of newly planted seed potatoes in the coastal area of the Carolinas; summary of control studies, 1925-1930
