Loading edition detail...
Preparing this view.
United States. Bureau of Land Management. Arizona State Office
"The Department of the Interior proposes to grant a right-of-way to Tucson Gas & Electric Company to construct one transmission line from Phoenix to Tucson, Arizona, in Maricopa, Pinal, and Pima Counties. The proposed line is an extension of the power distribution system from the Navajo Generating Plant. Anticipated power needs in the Tucson area will require additional transmission lines from Phoenix to Tucson which would parallel the proposed line"--Preliminary page.
| Publisher | U.S. Department of the Interior, Bureau of Land Management, Arizona State Office |
|---|---|
| Pages | 399 |
| Search language | english |
Publication-specific alternatives linked to the same work.