Join BookitisSave favorites, build lists, and follow creators.

Scope of work to perform interim environmental studies on Tract C-a for Rio Blanco Oil Shale Project

Work detail

Bookitis Pick
Cover for Scope of work to perform interim environmental studies on Tract C-a for Rio Blanco Oil Shale Project
SO
Image source: Open Library
NUS Corporation1 editions

"This scope of work reflects the effort proposed by NUS Corporation to perform interim environmental baseline studies and revision of the [Rio Blanco Oil Shale Project]℗RBOSP detailed development plan (DDP) in our revised proposal number 76.10.67R dated December 15, 1976. Section 2 includes the scopes of work℗ for the air, terrestrial, hydrology, and aquatic studies. Section 3 contains description of interim and baseline data analysis. Section 4 is a discussion of the report integration phase and schedules for accomplishing the work are presented in Section 5. Revisions required for the DDP are presented in Section 6 as an addendum"--Leaf i.

Overview

Shared work-level identity and catalog context.

1 credited authorSearch language english

Bookitis keeps work pages focused on the shared book identity and the editions that actually belong to it. Unrelated books should not appear here as primary content.

Contributors

People credited with this work in the active catalog.

  • NUS Corporation

    Author profile in the active Bookitis catalog

    Open Author

Editions

Publication-specific versions linked to this work only.