The planning, construction, and operation of an aquifer recharge and recovery infiltration basin in Grand Forks County, North Dakota
Work detail
The purpose of this report is to describe the initial design, the construction, and the operation of the FRC basin facility; and provide an assessment of its practicality and cost-effectiveness for other potential water users who may wish to attempt to use ARR technology to enhance water supplies. This report includes: (1) information concerning initial exploration and design of the basin; (2) a description of the methods used for placing water in the aquifer, and their effectiveness; (3) a discussion of water quality effects of basin recharge on the aquifer, including nitrate, total dissolved solids, sulfate, and pesticides; cost of basin operation; and (5) regulatory requirements imposed to insure aquifer protection during operation of the basin--Purpose and Scope.
Overview
Shared work-level identity and catalog context.
Contributors
People credited with this work in the active catalog.
- Open Author
W. M. Schuh
Editions
Publication-specific versions linked to this work only.