Join BookitisSave favorites, build lists, and follow creators.

Evaluation of decommissioned liquefied natural gas storage tanks at Chula Vista, California

Work detail

Bookitis Pick
Evaluation of decommissioned liquefied natural gas storage tanks at Chula Vis...
EO
James P. Lewis1 editions

San Diego Gas & Electric, SDG&E, built two of the first liquefied natural gas, LNG, peak shaving plants in the U.S. These plants were located on a common facility near SDG&E's South Bay power plant in Chula Vista, California, U.S.A., about 10 miles south of San Diego. The first plant went into service in 1965. A second liquefaction plant and storage tank were completed in 1970. These two plants were decommissioned in 1985 as a result of seismic evaluation based on the current perception of appropriate seismic design criteria for the site and on recent advances in dynamic structural analysis methods. The decision was made to dismantle the plants. The dismantling covered the period of April to September 1990. This publication provides the repot of decommissioning and dismantling of these facilities.

Overview

Shared work-level identity and catalog context.

1 credited authorSearch language english

Bookitis keeps work pages focused on the shared book identity and the editions that actually belong to it. Unrelated books should not appear here as primary content.

Contributors

People credited with this work in the active catalog.

  • James P. Lewis

    Author profile in the active Bookitis catalog

    Open Author

Editions

Publication-specific versions linked to this work only.